Given the backup power sharing scenario in Sect. 4.3.3 and illustrated by Fig. 4.4, two types of power outages may happen. To keep the network reliability, we need to control the possibility of network failures caused by asynchronous outages under a predefined threshold (denoted by 𝜖). Further practical constraints during the backup power deployment are as follows. 1. No BS misses: for any BS, its backup power is supplied by the batteries at one. Note that among the above mathematical representations, only x and yare unknown variables that need to solve, and all the other nations are either prior.